Securing the sign

Tuesday, October 23, 2007

Matt Bair, from left and Darren Pollmann fasten down the new sign at the McCook Christian Church on West Fifth and B Saturday morning. The sign was Bair's Eagle Scout project and was designed by Mark Beideck of BoMac Inc. Plasma Cutting. Doak Construction donated the use of their crane to lower the metal sign onto the steel posts set in concrete. In the near future, the sign will be wired for back lighting and a berm will be installed at the base.

To Read More
Subscribe Sign In
Continue reading with a subscription
Subscription options